Our new office location renovation is moving along. The exterior shingles have been removed and any framing and boards that needed to be fixed have been repaired. The roofer has been scheduled and the windows have been ordered. The back door and porch door are getting replaced, but I have decided to leave the original front door. I am a sucker for "old" wood doors!
The bathroom has been gutted and getting upfitted for handicap accessibility. The shower has been placed, the sink area has been relocated, and the drywall is up.
Our weather has been the typical South Carolina weather -BEAUTIFUL! The contractors have had no problems with getting the exterior work finished.